CITY OF STIRLING | DA26/1308

This building needs closer scrutiny.

Residents have a credible case against the proposal in its current form. The strongest concerns are its height and bulk, its effect on nearby homes, missing noise evidence and weak traffic assumptions.

The key message: Do not fight padel. Ask whether this particular building is an acceptable neighbour.

THE PROPOSAL AT A GLANCE

A major change beside homes

Two open, infrequently used bowling greens would be replaced by a large indoor sports building.

9padel courts
about 12 mat the highest point
about 2,744 m²enclosed building
6 am to 10 pmevery day
5additional parking bays

STRENGTH OF POSITION

Where the case is strongest

Refusal is possible, but not guaranteed. Focus effort on the issues the City must assess.

Height, bulk and scale

Strong

The building reaches about 12 metres above natural ground. Its size and mass sit beside a low-rise residential area.

Ask: Ask the City to refuse the current design or require a much lower and smaller building.

Effect on nearby homes

Strong

The proposal replaces an open recreation area with a large enclosed commercial building beside homes.

Ask: Ask the City to assess the full effect on residential amenity, not height alone.

Missing noise evidence

Strong

The application did not include the noise assessment sought during early discussions with the City.

Ask: Ask the City to obtain and assess the noise report before it makes a decision.

Operating hours

Strong

The proposed hours are 6:00 am to 10:00 pm, every day. This makes noise and evening activity important issues.

Ask: Ask for evidence that nearby homes will be protected during the full operating period.

Traffic assumptions

Moderate to strong

The applicant compares padel use with the theoretical capacity of bowling greens it also describes as infrequently used.

Ask: Ask for a traffic study based on realistic peak bookings and other activities at the site.

Parking spillover

Moderate

The plans increase parking from 146 bays to 151 bays. The applicant also proposes telling patrons not to use nearby residential streets.

Ask: Ask how parking in Adriatic Lane and Carpenteria Drive would be prevented when the main car park is busy.

Landscaping and screening

Moderate

The proposal relies on a two-metre planting strip and climbing plants on six-metre rigging beside a building about twice that height.

Ask: Ask the City to assess the building before assuming mature plants will screen it.

Treat with care: Overshadowing is not yet established. Do not lead with zoning, property values or a private right to a view.

THE CENTRAL CASE

Make the applicant prove the impact is acceptable

01

Height is not the whole test

Meeting a maximum height does not prove that the building's bulk, scale and relationship with nearby homes are acceptable.

02

Business need is not planning proof

The applicant says extra height is needed for indoor padel. That does not show that this building suits this residential location.

03

The noise report should come first

The City should understand likely noise at nearby homes before it decides whether the proposal is acceptable.

APPLICANT'S OWN DRAWINGS

Use each drawing to ask a precise question

The drawings do not prove that the proposal must be refused. They connect each concern to a fact shown in the applicant's own plans.

How to use this section: See what the drawing shows. Read why it matters. Then use the question in your submission or when speaking with the City.
PAGE 38 | DRAWING A00

The proposal in context

What it shows: An artist's view of the building from Carpenteria Drive and Adriatic Lane.

Why it matters: It helps residents identify the proposed form and street interface. It is an illustration, not proof that the impact is acceptable.

Question for the City

Does the final built form match this presentation, including the visible height, materials and screening?

PAGE 41 | DRAWING A04

Landscaping beside the building

What it shows: A two-metre landscaping strip and six-metre green wall rigging along the residential edge.

Why it matters: The building is about 12 metres high. Landscaping may soften its appearance, but it cannot remove the underlying bulk.

Question for the City

What will residents see when the building opens, before the climbing plants mature?

PAGE 42 | DRAWING A05

Five more parking bays

What it shows: The parking plan deletes some bays and adds others. The stated net result is an increase from 146 bays to 151 bays.

Why it matters: This confirms that a nine-court venue adds only five net bays across the wider site.

Question for the City

How will the site handle realistic peak padel bookings alongside other activities without spillover into nearby streets?

PAGE 44 | DRAWING A07

Height beside neighbouring homes

What it shows: The proposed roof level, natural ground level, height controls and schematic neighbouring homes on one page.

Why it matters: This is the strongest visual reference for the height, bulk and residential interface concern.

Question for the City

Does this height and building mass produce an acceptable relationship with the nearby low-rise homes?

Page links may open at the start of the PDF on some phones. The page number is shown on every evidence card.

TEAM ROLES

Assign the work once

Nominate one person for each coordination role in the WhatsApp group. Every household remains responsible for its own submission.

WhatsApp coordinator

Keeps the group focused. Shares the briefing, deadlines and short updates.

Delivers: One clear group update when something changes.

City contact

Sends questions to the planner and keeps the written replies together.

Delivers: A shared record of requests, answers and missing documents.

Evidence coordinator

Collects photos and notes from residents. Sorts them by concern.

Delivers: A simple evidence folder with dates and locations.

Draft reviewers

Check submissions for clear facts, personal detail and a requested outcome.

Delivers: Reviewed drafts that remain individual to each household.

Council liaison

Tracks the application after consultation closes. Watches for meetings and deputations.

Delivers: Timely notice of the next decision point.

Each household

Chooses relevant concerns, adds personal evidence and lodges its own submission.

Delivers: One genuine submission from every participating household.
Keep names in WhatsApp. This public page lists responsibilities without publishing residents' details.

ACTION PLAN

Who does what, and by when

Use roles for now. Add names in the WhatsApp group without publishing personal information here.

9 Sep

City contact

Ask for the missing noise assessment and consultation details.

Get a written response from the City.

10 Sep

WhatsApp coordinator

Share this briefing and confirm the roles below.

Give neighbours one reliable source.

12 Sep

Each household

Choose two or three concerns that affect your home.

Create a personal issue list.

14 Sep

Each household

Take relevant photos and record likely impacts.

Collect useful evidence.

16 Sep

Each household

Write a short individual submission.

Complete a first draft.

18 Sep

Review volunteers

Check drafts for clarity and relevant planning concerns.

Improve each submission without making them identical.

20 Sep

Each household

Lodge the submission and save the confirmation.

Submit before the last-minute rush.

22 Sep, 5:00 pm

WhatsApp coordinator

Check that everyone who planned to submit has done so.

Meet the City's hard deadline.

After closing

Council liaison

Monitor the application and meeting notices.

Prepare neighbours for any public meeting.

Hard deadline: The City must receive submissions by 5:00 pm on Tuesday 22 September 2026.

WRITE YOUR SUBMISSION

Build a clear starting draft

The picker adds short issue headings, not ready-made arguments. Your own observation provides the substance.

Same central case. Different household evidence. The copy button stays locked until you add a personal observation.

1Choose your concerns

Pick only the points that genuinely affect your household.

2Add your own observation

Write what is specific to your home. Include where you are and what may change.

Use your own words. Add at least 20 characters to unlock copying.

3Review and edit your draft

Replace every bracketed prompt. Change anything that does not sound like you before submitting.

Go to City page

USEFUL LANGUAGE

Say what the City can assess

AVOID
  • Nobody wants it.
  • It is an eyesore.
  • It will lower property values.
  • We have a right to keep our view.
  • Twelve metres means four storeys.
USE
The proposed building's height, bulk, scale and operating impacts may cause an unreasonable effect on the surrounding residential area.

Then explain the specific effect on your household.

THE OUTCOME TO REQUEST

Refuse the current proposal

If refusal is not achieved, ask for a major redesign with less height and bulk, better setbacks and screening, and enforceable controls for noise, hours, lighting, traffic and parking.

Open the application page